===== Air pressure test ===== | ===== Air pressure test ===== | ||
- | The **air pressure test**, or the **n< | + | The **air pressure test**, or the **n< |
\\ | \\ | ||
Line 24: | Line 24: | ||
- | In Germany, a target value for new buildings was first introduced by the German Energy Saving Ordinance (EnEV) of 01.02.2001. **Specific values for the pressurisation test (n< | + | In Germany, for example, a target value for new buildings was first introduced by the German Energy Saving Ordinance (EnEV) of 01.02.2001. **Specific values for the pressurisation test (n< |
- | Experience with low-energy and Passive Houses has shown that better | + | Experience with low-energy and Passive Houses has shown that better |
\\ | \\ | ||
===== The Passive House ===== | ===== The Passive House ===== | ||
- | Much better values are often achieved for Passive Houses: n< | + | Much better values are regularly |
\\ | \\ | ||
|{{ : | |{{ : | ||
Line 36: | Line 36: | ||
and the EnEV requirements. Nowadays, if one wishes to build a\\ | and the EnEV requirements. Nowadays, if one wishes to build a\\ | ||
house, attention should be paid to a high level of airtightness\\ | house, attention should be paid to a high level of airtightness\\ | ||
- | - because trying to improve the airtightness afterwards is very\\ | + | - because trying to improve the airtightness afterwards is much more\\ |
difficult and only possible during the course of a full\\ refurbishment.**// | difficult and only possible during the course of a full\\ refurbishment.**// | ||
Line 43: | Line 43: | ||
[[planning: | [[planning: | ||
+ | |||