User Tools

Site Tools


planning:lift_energy_demand

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
planning:lift_energy_demand [2021/06/16 09:39] – [PHPP-tool] nsukhijaplanning:lift_energy_demand [2021/09/08 15:14] (current) – removed nsukhija
Line 1: Line 1:
-====== Lift energy demand ====== 
  
-===== PHPP-tool ===== 
- 
- 
-The Excel tool supports the planner  to assess the energy demand of lifts, for example, in the early planning stage. A detailed determination of the energy requirement is also possible. The assessment follows the calculations presented in VDI 4707 2009-3.  
- 
-The program was developed within the framework of Arbeitskreis kostengünstige Passivhäuser, Phase V, Nr. 51 "Planungs- und Umsetzungshilfen für Passivhaus-Nichtwohngebäude" [Planning and Implementation Aids for Passive House Non-residential Buildings], funded by: DBU Deutsche Bundesstiftung Umwelt; Hessisches Ministerium für Umwelt, Energie, Landwirtschaft und Verbraucherschutz; proKlima - der enercity-Fonds;  FAAG Technik GmbH. 
- 
-// {{ :picopen:manual_tool_lift_energy_demand_assessment.pdf |Download manual}}  
planning/lift_energy_demand.1623829140.txt.gz · Last modified: 2021/06/16 09:39 by nsukhija