User Tools

Site Tools


planning:lift_energy_demand_tool

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
planning:lift_energy_demand_tool [2021/09/08 15:18]
nsukhija
planning:lift_energy_demand_tool [2021/09/08 15:18] (current)
nsukhija
Line 13: Line 13:
 This tool was developed within the framework of: Arbeitskreis kostengünstige Passivhäuser,​ Phase V, Nr. 51 "​Planungs- und Umsetzungshilfen für Passivhaus-Nichtwohngebäude"​ [Planning and Implementation Aids for Passive House Non-residential Buildings]. This tool was developed within the framework of: Arbeitskreis kostengünstige Passivhäuser,​ Phase V, Nr. 51 "​Planungs- und Umsetzungshilfen für Passivhaus-Nichtwohngebäude"​ [Planning and Implementation Aids for Passive House Non-residential Buildings].
  
-Download the manual [[https://​database.passivehouse.com/​de/​download/​product_page/​manual-tool-lift-energy-demand|here]]+Download the manual [[https://​database.passivehouse.com/​de/​download/​product_page/​manual-tool-lift-energy-demand|here]].
  
 ---- ----
 Click [[:​planning:​tools|here]] to go back to the main menu. Click [[:​planning:​tools|here]] to go back to the main menu.
planning/lift_energy_demand_tool.txt · Last modified: 2021/09/08 15:18 by nsukhija